• 0

Project Consultancy, Reports & Profiles

 

Reasons why you should start a Business in Sierra Leone

:

Sierra Leone's economy is one of the most rapidly rising in Sub-Saharan Africa. Its GDP growth rate is expected to average 8% each year, compared to an average of roughly 5% for other Sub-Saharan African countries. Mining, diamonds, and oil exploration are all major industry. It also has abundant mineral resources, including bauxite, iron ore, and rutile (the country's main export). Agriculture generates around 45 percent of the country's gross domestic product (GDP). Rice, coffee, cocoa, palm kernels, and palm oil are the principal crops. Production was 787 kg, with 3 million carats worth $250 million in diamonds.

 

What are the Natural Resources in Sierra Leone?

Sierra Leone's principal natural resources are diamonds and gold. Diamonds are mined in kimberlitic pipe mines and alluvial deposits along rivers. River sand and alluvial deposits are rich in gold. Mined materials include limestone, granite, marble, iron ore, clay, salt, and bauxite. Forests represent nearly a third of Sierra Leone's total area, but deforestation has cut timber production significantly. Many mineral springs with medicinal characteristics can be found across Sierra Leone. Aside from minerals, there is a lot of arable land, which generates food for both local use and export.

 

What are the Business Opportunities in Sierra Leone?

Agriculture, with its adaptability for farming, mining, forestry, and fishing, is one of the most promising industries to take use of this opportunity. Sierra Leone has recently begun to develop its economy by forming foreign collaborations and expanding its private sector. This includes boosting options for enterprises looking to set up shop within the country's borders. Here are a few reasons why launching a business in Sierra Leone could be the next big thing for you. 1) A sizable workforce with a strong work ethic: Sierra Leone has a population of over 6 million people. The majority of Sierra Leoneans continue to work hard every day in order to sustain themselves and their families. Residents, in reality, frequently work long days, up to 16 hours each day. 2) Plenty of natural resources: It has plenty of natural resources, including iron ore, rutile (titanium dioxide), bauxite (aluminum ore), gold, diamonds, and more.

 

What Businesses are Successful in Sierra Leone?

Many businesses have thrived in Sierra Leone as a result of the country's natural resources:

Agriculture is a very important sector.

Mineral Resources and Mining.

Infrastructure for energy.

Construction is a growing industry.

Infrastructure for tourism.

 

Is Sierra Leone Good for Business?

Sierra Leone is a developing market with both domestic and international commercial potential. As a developing nation, it’s regarded as one of the greatest areas to launch a new company! Here are a few compelling reasons to consider establishing a business in Sierra Leone: * Access to affordable labor * a fast-growing economy * a low tax rate * well-developed infrastructure * no trade restrictions or quotas for imports or exports * low inflation rates.

 

Business-Friendly Policies and Government Initiatives of Sierra Leone.

Sierra Leone has achieved great progress in corporate regulations, as well as in the infrastructure and capability of regulatory bodies. Still, there has been progress in terms of government-sponsored programmers and initiatives. We'll take a look at a few of them below. Here are some of the most important business-friendly legislation and other prominent government initiatives that have helped Seychelles become one of the most popular investment destinations in the world. There are a number of commercial and public sector initiatives that make it simpler for new business opportunities to emerge. There is no tax on imports and exports, no tax on earnings or dividends, and no restrictions on capital and profit repatriation. All you have to do now is register your business with the appropriate authorities.

 

Sierra Leone Industrial Infrastructure.

Sierra Leone is endowed with natural resources and enjoys a relatively stable economic climate. Sierra Leone has been able to prosper economically through imports and exports due to its geographical location. It also acts as a vital transit hub for countries in West Africa.

 

What are the steps for Starting a Business in Sierra Leone?

If you want to start a business in Sierra Leone, you'll need the following items. A letter from you explaining why you wish to register and what type of business you have; a completed application form signed by you (and any other partners); a passport-size photo of yourself; each partner should have a passport-sized photograph; all partners must be citizens or legal residents of Sierra Leone. This can be verified using their national identity card, driver's license, or a recent utility bill bearing their name; and two copies of an extract from the National Registry demonstrating that none of you have previously registered another company in your name. If you don't have one, two letters from persons who know you well, such as friends or family members, verifying that they are familiar with you and are unaware of any past firms established in your name; a copy of the SLRA-issued trade license (which can be obtained after registration); An undertaking letter indicating that anyone involved in the operation of a corporation who commits bribery, fraud, or corruption will lose their share of the company. The Registrar General's Office at Aberdeen House, Freetown OR the Registrar General's Office at Kissy Road, Freetown must receive these documents. You will be notified that your documents have been received after they have been received. Within 14 days, your firm was accepted and registered. You should also obtain a certificate of incorporation, which contains information about your new company's name, registration date, and number. This procedure takes about two weeks. You can still start a business after receiving your certificate of incorporation. Sierra Leone is endowed with natural resources and enjoys a relatively stable economic climate. Sierra Leone has been able to prosper economically through imports and exports due to its geographical location. It also acts as a vital transit hub for countries in West Africa. Within 14 days, your firm was accepted and registered. You should also obtain a certificate of incorporation, which contains information about your new company's name, registration date, and number. This procedure takes about two weeks. You can still start a business after receiving your certificate of incorporation.

 

Market Size of Sierra Leone.

Sierra Leone's economy is classified as a least developed country, having a gross domestic product of less than $1 billion. Sierra Leone's GDP (gross domestic product) is expected to reach US$4.93 billion in 2025. Sierra Leone's real total GDP (gross domestic product) is predicted to increase by 4.67 percent by 2025. Sierra Leone's GNI (gross national income) is expected to reach US$5.08 billion in 2025.

 

Industrial Growth of Sierra Leone.

Sierra Leone has one of the fastest-growing economies in West Africa. Sierra Leone's annual average gross domestic product (GDP) growth rate was 7.8%, much greater than any other West African country. Government officials are emphasizing on industrial development by offering low corporation tax rates (10%), easy access to finance, and high-quality infrastructure, such as sea ports, an international airport, and direct telephone lines, as a crucial element in such strong economic growth. As a result, an increasing number of companies are establishing operations in Sierra Leone.

 


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
E-Waste Recycling Plant
E-Waste Recycling Plant

Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplu... Read More

Capacity :
7500 MT/annum
Plant and Machinery cost:
131.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
30.00 %
TCI :
0.00 Lakhs
Cost of Project :
1272.00Lakhs
Add To Inquiry Basket
E-Waste Recycling Plant
E-Waste Recycling Plant

Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a descr... Read More

Capacity :
Copper Wire :1.67 MT/day Plastic Granules :7.43 MT/day Glass :3.23 MT/day Fer
Plant and Machinery cost:
131.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
30.00 %
TCI :
0.00 Lakhs
Cost of Project :
1272.00Lakhs
Add To Inquiry Basket
Bicycle Manufacturing
Bicycle Manufacturing

Bicycles are one of the oldest forms of transportation. Even today millions of people travel by bicycle daily to the... Read More

Capacity :
2000 Nos./day
Plant and Machinery cost:
336.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
1589.00Lakhs
Add To Inquiry Basket
Solar Panel & Electronic Toys
Solar Panel & Electronic Toys

A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provi... Read More

Capacity :
SOLAR PANEL: 25,000Units/annum ELECTRONIC TOYS :1,500,000 Units/annum
Plant and Machinery cost:
498.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
1348.00Lakhs
Add To Inquiry Basket
Solar Panel
Solar Panel

A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provi... Read More

Capacity :
25,000 KW/annum
Plant and Machinery cost:
449.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
1126.00Lakhs
Add To Inquiry Basket
Paper Napkins, Toilet Paper Rolls & Facial Tissues
Paper Napkins, Toilet Paper Rolls & Facial Tissues

The tissues paper sector has boomed over the last few years. With a move to more luxurious tissue paper and ultra-absorbent... Read More

Capacity :
Toilet Paper Rolls : 7,200,000 Nos./annum Paper Napkin (100 Pcs.): 558,000 Nos./annum Facial Tissue
Plant and Machinery cost:
59.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
341.00Lakhs
Add To Inquiry Basket
Detergent Cake & Powder
Detergent Cake & Powder

Detergents are defined as complete washing or cleaning products, which contain among their ingredients an organic surface-active ... Read More

Capacity :
Detergent Cake :180,000 Kgs/annum Detergent Powder :180,000 Kgs/annum
Plant and Machinery cost:
15.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
76.00 %
TCI :
0.00 Lakhs
Cost of Project :
36.00Lakhs
Add To Inquiry Basket
Solar Panel Assembling & Solar Power Inverter On Grid, Off Grid with Solar Pump Controller
Solar Panel Assembling & Solar Power Inverter On Grid, Off Grid with Solar Pump Controller

A solar cell, sometimes called a pho... Read More

Capacity :
Poly Crystaline Solar PV Modules (10, 20, 50,100 & 300 Watt): 74,00,000 Nos per annum Solar Inverte
Plant and Machinery cost:
2162.88 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
36.00%
Break Even Point (BEP):
31.00 %
TCI :
21918.00 Lakhs
Cost of Project :
21918.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water
Packaged Drinking Water

Water is the necessity of our daily life, it’s so important for us that we need clean, safe and sanitary water every day, and us... Read More

Capacity :
210 Lakhs Nos. /annum
Plant and Machinery cost:
719.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
56.00 %
TCI :
1736.00 Lakhs
Cost of Project :
1736.00Lakhs
Add To Inquiry Basket
E–Waste Recycling Plant
E–Waste Recycling Plant

E-waste is a popular, informal name for electronic products nearing the end of their useful life. While there is no generally accepted definition o... Read More

Capacity :
2164500 kgs. /annum
Plant and Machinery cost:
233.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
22.91%
Break Even Point (BEP):
49.81 %
TCI :
500.00 Lakhs
Cost of Project :
500.00Lakhs
Add To Inquiry Basket
ELECTROLYTIC MANGANESE DIOXIDE
ELECTROLYTIC MANGANESE DIOXIDE

EMD is a complex composite of various crystals of manganese and oxygen that is produced through electro-winning. It is used primarily as the active... Read More

Capacity :
Electrolytic Manganese Dioxide 5 MT Per Day
Plant and Machinery cost:
89.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
576.00Lakhs
Add To Inquiry Basket
E Waste Recycling Plant
E Waste Recycling Plant

E waste is a popular, informal name for electronic products nearing the end of their useful life. Computers, televisions, VCRs, stereos, copiers, a... Read More

Capacity :
5 MT/Day
Plant and Machinery cost:
60.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
15.00%
Break Even Point (BEP):
43.00 %
TCI :
241.00 Lakhs
Cost of Project :
241.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water with PET Bottles
Packaged Drinking Water with PET Bottles
Profile Water forms an essential part of every human being. Since it is a human necessity it makes best sense to do business in. As a normal human b... Read More
Capacity :
Plant and Machinery cost:
131.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
40.00%
Break Even Point (BEP):
58.00 %
TCI :
350.00 Lakhs
Cost of Project :
350.00Lakhs
Add To Inquiry Basket
Calcined Bauxite through Rotary Kiln
Calcined Bauxite through Rotary Kiln
Calcined bauxite is an important raw material for two main markets: refractories and abrasives. Smaller volumes are consumed in other applications in... Read More
Capacity :
100 MT/Day
Plant and Machinery cost:
825.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
49.00 %
TCI :
1352.00 Lakhs
Cost of Project :
1352.00Lakhs
Add To Inquiry Basket
WOODEN TOOTHPICK
WOODEN TOOTHPICK

A toothpick is a small stick of wood, plastic, bamboo, metal, bone or other substance used to remove detritus from the teeth, usually after a meal.... Read More

Capacity :
0
Plant and Machinery cost:
6.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
62.00 %
TCI :
22.00 Lakhs
Cost of Project :
22.00Lakhs
Add To Inquiry Basket
Curcumin(Turmeric) The Indian solid gold
Curcumin(Turmeric) The Indian solid gold

PRODUCT PROFILE Curcumin is the principal curcuminoid of the popular Indian spice turmeric, which is a member of the ginger family. It is the main ... Read More

Capacity :
23400 Kg/Annum, Curcumin 23400 kg/Annum, Turmeric oil 550 MT/ Annum, De-oiled turmeric powder
Plant and Machinery cost:
122.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
54.00%
Break Even Point (BEP):
51.00 %
TCI :
289.00 Lakhs
Cost of Project :
289.00Lakhs
Add To Inquiry Basket
E-WASTE RECYCLING PLANT
E-WASTE RECYCLING PLANT

Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a loose category of surplus, obsolete, broken, or discar... Read More

Capacity :
-
Plant and Machinery cost:
51.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
47.00%
Break Even Point (BEP):
40.00 %
TCI :
196.00 Lakhs
Cost of Project :
196.00Lakhs
Add To Inquiry Basket
MEDICAL DISPOSABLES: Disposable Syringes (Self Destructive) with Needles, Catheters and Mask
MEDICAL DISPOSABLES: Disposable Syringes (Self Destructive) with Needles, Catheters and Mask

Disposable needle is widely used by ... Read More

Capacity :
0
Plant and Machinery cost:
147.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
47.00 %
TCI :
426.00 Lakhs
Cost of Project :
426.00Lakhs
Add To Inquiry Basket
Growing Prospects for Packaged Drinking Water Industry
Growing Prospects for Packaged Drinking Water Industry

Water everywhere, not a CLEAN drop to drink! Who would have thought that there will be a day when sanitation of available water would be more of a... Read More

Capacity :
30,000 Thousand Nos./Annum or 1,00,000 Bottles /day
Plant and Machinery cost:
105.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
44.00%
Break Even Point (BEP):
63.00 %
TCI :
282.00 Lakhs
Cost of Project :
282.00Lakhs
Add To Inquiry Basket
Alumina from Bauxite (By Calcination Process)
Alumina from Bauxite (By Calcination Process)

-

Read More
Capacity :
66.66 MT/Day
Plant and Machinery cost:
671.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
38.00 %
TCI :
2112.00 Lakhs
Cost of Project :
2112.00Lakhs
Add To Inquiry Basket
Wooden Furniture (With Mediocre Automation)
Wooden Furniture (With Mediocre Automation)

The term wooden furniture is used for articles of daily use in dwelling house, place of business, public buildings, and includes items such as chai... Read More

Capacity :
20 Articles/Day
Plant and Machinery cost:
13.00 Lakhs
Working Capital :
28.00
Rate of Return (ROR):
42.81%
Break Even Point (BEP):
48.28 %
TCI :
73.00 Lakhs
Cost of Project :
73.00Lakhs
Add To Inquiry Basket
Bicycle Tyres
Bicycle Tyres

Bicycle tyre is the backbone of the cycle industries. There are few numbers of organized manufacturing companies are engaged in the quality grade c... Read More

Capacity :
4000 Nos./Day
Plant and Machinery cost:
36.00 Lakhs
Working Capital :
57.00
Rate of Return (ROR):
59.50%
Break Even Point (BEP):
38.47 %
TCI :
163.00 Lakhs
Cost of Project :
163.00Lakhs
Add To Inquiry Basket
Wooden Furniture
Wooden Furniture

The furniture making is an ancient art in India before centuries. The expertise of India in manufacturing furniture was accepted by all the parts o... Read More

Capacity :
20 Pcs/Day
Plant and Machinery cost:
4.00 Lakhs
Working Capital :
5.00
Rate of Return (ROR):
111.00%
Break Even Point (BEP):
26.99 %
TCI :
13.00 Lakhs
Cost of Project :
13.00Lakhs
Add To Inquiry Basket
Aluminium From Bauxite of Gibbsite Variety
Aluminium From Bauxite of Gibbsite Variety

Residual rocks, in which the alumina trihydrate and monohydrate minerals gibbsite, boehmite, and diaspore predominate are classified as bauxite. Ot... Read More

Capacity :
20000 MT/Annum
Plant and Machinery cost:
615.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
17.00%
Break Even Point (BEP):
54.00 %
TCI :
1875.00 Lakhs
Cost of Project :
1875.00Lakhs
Add To Inquiry Basket
Paper Napkins
Paper Napkins

Tissue paper is often used for wrapping as in jewellery, liquors, fruits and florist trades etc. Napkins are manufactured from tissues. Paper napki... Read More

Capacity :
400 Kgs./ Day
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.88%
Break Even Point (BEP):
47.25 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Perfect Guide for Starting a Successful Business of Sulfur Powder Open Now Your Sulfur Powder Plant
Perfect Guide for Starting a Successful Business of Sulfur Powder Open Now Your Sulfur Powder Plant

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Plan for Production of Ready Mix Plaster,  Block Jointer, Tile Adhesive  and M 20 Concrete (Micro Concrete)
Business Plan for Production of Ready Mix Plaster, Block Jointer, Tile Adhesive and M 20 Concrete (Micro Concrete)

 

Ready Mix Plaster is a mixture of cement paste... Read More

Capacity :
0
Plant and Machinery cost:
294.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
1342.00Lakhs
Add To Inquiry Basket
Start Phosphate Rich Organic Manure (PROM) Production Business
Start Phosphate Rich Organic Manure (PROM) Production Business

 

Phosphate rice or... Read More

Capacity :
Phosphate Rich Organic Manure (PROM) 28,800 MT Per Annum
Plant and Machinery cost:
182.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
78.00 %
TCI :
0.00 Lakhs
Cost of Project :
359.00Lakhs
Add To Inquiry Basket
Stainless Steel Cold Rolled Coil Using Stainless Steel Scrap Manufacturing Business
Stainless Steel Cold Rolled Coil Using Stainless Steel Scrap Manufacturing Business

Stainless steel cold rolled... Read More

Capacity :
0
Plant and Machinery cost:
2863.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
48.00 %
TCI :
0.00 Lakhs
Cost of Project :
9293.00Lakhs
Add To Inquiry Basket
Setting up  Hemodialysis Blood Tubing  Business
Setting up Hemodialysis Blood Tubing Business

The introduction of hemodia... Read More

Capacity :
Homodialysis Blood Tubing Set 1,200,000 Pcs Per Annum
Plant and Machinery cost:
133.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
344.00Lakhs
Add To Inquiry Basket
Start Protein Based Nutrition Foods Production
Start Protein Based Nutrition Foods Production

 

Protein-based nut... Read More

Capacity :
Protein Based Nutrition Foods 1,200,000 Nos Per Annum (500 gms)
Plant and Machinery cost:
62.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
437.00Lakhs
Add To Inquiry Basket
A Business Plan for Soda Ash by Solvay process
A Business Plan for Soda Ash by Solvay process

 

Soda ash, also known as sodium carbonate, is a chemical compound produced when a base and an ac... Read More

Capacity :
Soda Ash (Na2CO3): 200,000 MT Per Annum, Ammonium Chloride (NH4Cl):200,000 MT Per Annum
Plant and Machinery cost:
14300.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
67.00 %
TCI :
0.00 Lakhs
Cost of Project :
21000.00Lakhs
Add To Inquiry Basket
Floral Foam (Phenolic Foam) with Resin Manufacturing Business
Floral Foam (Phenolic Foam) with Resin Manufacturing Business

 

Floral foam, also known as phenolic foam, is a lightweight, highly porous foam material used to hold and hyd... Read More

Capacity :
Floral Foam (Phenolic Foam): 90,000 Kg. Per Annum
Plant and Machinery cost:
84.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
366.00Lakhs
Add To Inquiry Basket
Setup Glass Fiber Reinforced Polymer (GFRP) Rebar Plant
Setup Glass Fiber Reinforced Polymer (GFRP) Rebar Plant

Glass Fiber Reinforced Polymer (GFRP) Rebar is a type of composite material that is made from combining glass fibers with a polymer matrix. This co... Read More

Capacity :
Glass Fibre Reinforced Polymer (GFRP) Bar (Size 8mm to 36 mm): 360,000 MT Per Annum
Plant and Machinery cost:
588.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
6097.00Lakhs
Add To Inquiry Basket
Start Polyvinyl Alcohol Production business
Start Polyvinyl Alcohol Production business

Polyvinyl Alcohol (PVOH) is a synthetic polymer created through the polymerization of vinyl acetate. It is a water-soluble ... Read More

Capacity :
Polyvinyl Alcohol: 6,000 MT Per Annum
Plant and Machinery cost:
449.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
1193.00Lakhs
Add To Inquiry Basket
A Global Recycling Business, Setup Steel Ingot from Scrap to Reduce Landfill and Save the Environment
A Global Recycling Business, Setup Steel Ingot from Scrap to Reduce Landfill and Save the Environment

Paul Vaulting, an innovator... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan for Yeast  From Molasses
A Business Plan for Yeast From Molasses

Yeast from mol... Read More

Capacity :
Cream Yeast: 3,600 MT Per Annum Powder Yeast: 1,500 MT Per Annum
Plant and Machinery cost:
100.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
2900.00Lakhs
Add To Inquiry Basket
Start-up Production of Latex Mattress
Start-up Production of Latex Mattress

 

Late... Read More

Capacity :
Latex Mattress Size: 38" x 75" (33Kg): 9,091 Nos. Per Annum
Plant and Machinery cost:
77.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
75.00 %
TCI :
0.00 Lakhs
Cost of Project :
195.00Lakhs
Add To Inquiry Basket
A Business Plan For Zeolite 4a (Detergent Grade)
A Business Plan For Zeolite 4a (Detergent Grade)

Zeolite 4A is ... Read More

Capacity :
Zeolite 4a (Detergent Grade): 3,000 MT Per Annum
Plant and Machinery cost:
154.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
688.00Lakhs
Add To Inquiry Basket
A Business Plan for Lithium Ion Battery (Battery Assembly)
A Business Plan for Lithium Ion Battery (Battery Assembly)

A lithium ion ... Read More

Capacity :
-
Plant and Machinery cost:
86.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
516.00Lakhs
Add To Inquiry Basket
Start Production Of Glass Sheet
Start Production Of Glass Sheet

Glass sheet is a type of glass that has been pro... Read More

Capacity :
Glass Sheet: 1,500,000 Sq.mt. Per Annum
Plant and Machinery cost:
9000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
12900.00Lakhs
Add To Inquiry Basket
India Sugarcane Bagasse Biodegradable Disposable Tableware Market
India Sugarcane Bagasse Biodegradable Disposable Tableware Market

Sugarcane Bagasse Biodegradable Disposable Tableware is a typ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A business plan  For Cardanol From Cashew Nut Shell Oil
A business plan For Cardanol From Cashew Nut Shell Oil

 

Card... Read More

Capacity :
Cardanol 24 MT Per Day
Plant and Machinery cost:
152.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
658.00Lakhs
Add To Inquiry Basket
Setup plant of Truck Trailer (Sidewall, Flatbed, Bulker, Tip Trailer & Container Trailer)
Setup plant of Truck Trailer (Sidewall, Flatbed, Bulker, Tip Trailer & Container Trailer)

Truck trailers are an essential part of any frei... Read More

Capacity :
-
Plant and Machinery cost:
313.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
69.00 %
TCI :
0.00 Lakhs
Cost of Project :
484.00Lakhs
Add To Inquiry Basket
A Business Plan for Premix Tea and Coffee Cappuccino, Vanilla Flavoured Coffee, Mocha Coffee, Masala Chai, Ginger Tea & Green Tea (for Diabetic and Non Diabetic)
A Business Plan for Premix Tea and Coffee Cappuccino, Vanilla Flavoured Coffee, Mocha Coffee, Masala Chai, Ginger Tea & Green Tea (for Diabetic and Non Diabetic)

Premix Tea and... Read More

Capacity :
-
Plant and Machinery cost:
13.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
35.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
119.00Lakhs
Add To Inquiry Basket
Start production of Biodegradable Disposable  Cups and Plates (Tableware) Using Sugarcane Bagasse
Start production of Biodegradable Disposable Cups and Plates (Tableware) Using Sugarcane Bagasse

Bagasse is the fibrous residue that remains afte... Read More

Capacity :
-
Plant and Machinery cost:
1924.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
38.00 %
TCI :
0.00 Lakhs
Cost of Project :
2687.00Lakhs
Add To Inquiry Basket
Own Delicious and Nutritious Potato Chips and Extruded Snack Food (Kurkure Type) Production Plant
Own Delicious and Nutritious Potato Chips and Extruded Snack Food (Kurkure Type) Production Plant

 

Product:

<...
Read More
Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Production of Ceramic Wall and Floor Tiles
Start Production of Ceramic Wall and Floor Tiles

Ceramic wall and floor tiles are a popular choice for a wide variety of applications, from residential to... Read More

Capacity :
Ceramic Wall & Floor Tiles 6,000 Sq.MT. Per Day
Plant and Machinery cost:
2724.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
5543.00Lakhs
Add To Inquiry Basket
A Business Plan  For Tantalum Powder from Tantalite Ore
A Business Plan For Tantalum Powder from Tantalite Ore

Tantalum is a rare transition metal that is mined from columbite-tantalite, which is an ore found in vari... Read More

Capacity :
Tantalum Powder 4 MT Per Day
Plant and Machinery cost:
235.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
1935.00Lakhs
Add To Inquiry Basket
Setup Plant OF Mica Powder From Mica Deposits
Setup Plant OF Mica Powder From Mica Deposits

Mica powder is a fine, powdery mineral that is made from mica deposits. Mica is a type of natural rock th... Read More

Capacity :
Mica Powder 40 MT Per Day
Plant and Machinery cost:
296.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
2684.00Lakhs
Add To Inquiry Basket
Setup plant  Of Ferric Pyrophosphate (Food Grade and Pharma Gade)
Setup plant Of Ferric Pyrophosphate (Food Grade and Pharma Gade)

Ferric pyrophosphate is a phosphate-iron compound that is used as a food additive, dietary supplement and in p... Read More

Capacity :
Ferric Pyrophosphate Anhydrous 420 MT Per Annum (Food Grade) Ferric Pyrophosphate Nonhydrate 1
Plant and Machinery cost:
8.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
96.00Lakhs
Add To Inquiry Basket
Start Industry Of Chocolate
Start Industry Of Chocolate

Chocolate is a universally beloved food item made from cocoa ... Read More

Capacity :
Chocolate 1,000 Kg. Per Day
Plant and Machinery cost:
120.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
815.00Lakhs
Add To Inquiry Basket
Yeast from Molasses Dry & Compressed Yeast Manufacturing Plant
Yeast from Molasses Dry & Compressed Yeast Manufacturing Plant

Yeast from Molasses (Dry & Compressed Yeast) is a specialized type of yeast that ... Read More

Capacity :
Compressed Yeast 5,000 Kgs per day Dry Yeast 5,000 Kgs per day
Plant and Machinery cost:
2000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
2800.00Lakhs
Add To Inquiry Basket
Setup Industry  Of Connecting Rod MK2 (Electro Galvanized) for Hand Pump
Setup Industry Of Connecting Rod MK2 (Electro Galvanized) for Hand Pump

The connecting rod is an es... Read More

Capacity :
Connected Rod MK2 for Hand Pump 540,000 Pcs Per Annum MS Scrap 120 Pcs Per Annum
Plant and Machinery cost:
18.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
195.00Lakhs
Add To Inquiry Basket
Start Production Of Lawn Tennis Ball
Start Production Of Lawn Tennis Ball

The "lawn tennis ball," a specific ball, is the one used to p... Read More

Capacity :
Tennis Ball 10,000 Nos. per day
Plant and Machinery cost:
48.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
66.00 %
TCI :
0.00 Lakhs
Cost of Project :
168.00Lakhs
Add To Inquiry Basket
Setup Plant Of Chlorinated Polyvinyl Chloride
Setup Plant Of Chlorinated Polyvinyl Chloride

Chlorinating the vinyl chloride monomer produces chlorinated polyvinyl chloride (CPVC... Read More

Capacity :
Chlorinated Polyvinyl Chloride 6,000 MT per Annum
Plant and Machinery cost:
396.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
1279.00Lakhs
Add To Inquiry Basket
Start Production Of PP Woven Bags
Start Production Of PP Woven Bags

Polypropylene woven bags, sometimes referred to as PP woven bags, are a kind of packa... Read More

Capacity :
PP Bags (L-915 x W-610 mm) (Per Bag Weight App. 90 gms) 100,000 Nos per day
Plant and Machinery cost:
1263.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
2314.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Biodegradable Plastic Bags From Corn Starch
Manufacturing Business Of Biodegradable Plastic Bags From Corn Starch

Environmentally friendly alternatives to conventional plastic... Read More

Capacity :
Biodegradable Plastic Bags (Per Bag 25 gms Size) 12 MT per day
Plant and Machinery cost:
1053.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
1498.00Lakhs
Add To Inquiry Basket
How to Setup Lawn Tennis Ball Plant
How to Setup Lawn Tennis Ball Plant

Tennis is a well-known sport, and the little, spherical, fuzzy yell... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan  Cosmetic Unit (Serum, Cream & Shampoo)
A Business Plan Cosmetic Unit (Serum, Cream & Shampoo)

A cosmetic unit typically includes a serum, cream, and shampoo that work together to hydrate, nourish, and protect your skin and hair. Serums are l... Read More

Capacity :
Serum 199,992 Nos Per Annum Cream 600,000 Nos Per Annum Shampoo 600,000 Nos Per Annum
Plant and Machinery cost:
32.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
552.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Start a Production Of Com... Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day 27.00 522.00
Start Industry Of Craft B... Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot 27.00 2007.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
Setup Plant Of Titanium ... Titanium Dioxide 4 MT Per Day 27.00 1455.00
Setup Plant Of Lab Cultu... Lab Cultured Diamonds (1 Carat) 30 Carat Per Day 25.00 361.00
Start Lemon Processing Un... Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs 25.00 314.00
Solar PV (Photovoltaic) G... Solar PV (Photovoltaic) Glass 90,000 MT Per Annum 28.00 4200.00
A Business Plan For Pea P... Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day 27.00 614.00
Setup Plant Of Acrylate... Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum 30.00 2291.00
Start Latex Rubber Thread... Latex Rubber Thread 200 Kg. Per Day 26.00 412.00
Start Cosmetic Unit (Seru... - 36.00 1617.00
Pioneering Pea Protein Bu... 0 0.00 0.00
Start Production Of Silic... - 28.00 4716.00
A Business Plan for IV Fl... IV Fluids (500 ml Size Pack) 78,000 Packs Per Day 27.00 1263.00
Start Industry of Liquor ... Wine (750 ml Size) 4,000,000 Bottles per annum Whiskey (375 ml Size) 4,000,000 Bottles per annum B 28.00 1880.00
Setup Pharmaceutical Unit... - 37.00 35774.00
Start Industry with Serum... 0 0.00 0.00
Setup Unit Of Cement Plan... Cement Plant 40,000 Bags per Day 26.00 25200.00
A Business Plan for Steri... Sterial Water for Injection 500 ml Size Pack 20,000 Sachets Per Day 30.00 1234.00
Setup Plant Of Lead From ... Lead Ingot 30 MT Per Day 28.00 2231.00
A Business Plan Blood Col... - 28.00 2294.00
A Business Plan for Parac... Paracetamol Powder 7 MT Per Day 27.00 779.00
Start Manufacturing Busin... Baby Diapers (4 Pcs.) 84,000 Pkts Per Day Adult Diapers (4 Pcs.) 18,000 Pkts Per Day Sanitary 29.00 4201.00
Start Tissue Paper Manufa... Tissue Paper 20 MT Per Day 27.00 2101.00
Launching a Solar Panel ... Solar Panel 500 MW per annum 32.00 5353.00
Biodegradable Disposable ... - 27.00 2774.00
Setup Curcumin Extraction... Curcumin Powder 100 Kgs per day Turmeric Oil 47 Kgs per day Deoiled Turmeric 1,853 Kgs 28.00 491.00
Setup Active Pharmaceutic... Paracetamol 10,000 Kgs Per Day Azithromycin 10,000 Kgs Per Day Metformin 10,000 Kgs 33.00 5246.00
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
12345678910...

Showing 241 - 300 of 618 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR